WEAU | Eau Claire, Wisconsin | News

Groundwork begins on St. Croix Crossing project

ST. PAUL, Minn. (AP) -- Crews are beginning groundwork on the St. Croix Crossing project to connect Minnesota and Wisconsin.

The Minnesota Department of Transportation says crews this week will begin hauling materials adjacent to the Beach Road ramp off eastbound Highway 36 in Oak Park Heights.

Piles of dirt will be monitored during the winter to measure the weight-bearing ability of soils beneath the piles.

Crews also will build a parking lot this fall for use by the city of Oak Park Heights and a restaurant, to replace parking spaces lost to changes in the frontage road.

The St. Croix Crossing project will replace the 80-year-old Stillwater Lift Bridge with a four-lane bridge that will connect expressways on both sides of the St. Croix River.


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus
WEAU 13 NEWS 1907 S. Hastings Way Eau Claire, WI 54701 By Phone: Main Number (715) 835-1313 and (715) 832-3474. Tip Line (715) 839-WEAU - (715) 839-9328 Sports Line (715) 852-1537
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 177755591 - weau.com/a?a=177755591