TRAFFIC ALERT: Construction causes traffic backup on I-94

By: WEAU 13 News Staff Email
By: WEAU 13 News Staff Email
It started around 2:45 p.m.  The state patrol believes it could last for two hours.

Traffic barricade in snow

EAU CLAIRE, Wis. (WEAU) – Traffic is backed-up for a few miles on I-94 because of construction.

The Wisconsin State Patrol says the backup lasts for more than three miles. It’s between the Foster and Osseo exits.

It started around 2:45 p.m. The state patrol believes it could last for two hours.


You must be logged in to post comments.

Username:
Password (case sensitive):
Remember Me:
WEAU 13 NEWS 1907 S. Hastings Way Eau Claire, WI 54701 By Phone: Main Number (715) 835-1313 and (715) 832-3474. Tip Line (715) 839-WEAU - (715) 839-9328 Sports Line (715) 852-1537
Copyright © 2002-2016 - Designed by Gray Digital Media - Powered by Clickability 207926231 - weau.com/a?a=207926231
Gray Television, Inc.